|
|
濰坊某橡塑有限公司位于著名的中國蔬菜之鄉(xiāng)——山東省壽光市,該企業(yè)產(chǎn)生污水主要包括工業(yè)廢水和生活污水。工業(yè)廢水主要來源于工藝生產(chǎn)中間隙排放的高濃度廢液(脫脂、磷化、電泳廢液等)和連續(xù)排放的脫脂溢流廢水、水洗廢水、磷化溢流廢水及電泳廢水、噴漆廢水等。
處理工業(yè)污水水質(zhì)
排放標準
工業(yè)污水處理方案:
來自生產(chǎn)車間的生產(chǎn)廢水0.5m3/h,通過廠區(qū)內(nèi)自流管道自流至隔油調(diào)節(jié)池,將污水中部分懸浮石油去除,在調(diào)節(jié)池內(nèi)進行PH的調(diào)節(jié)。
隔油調(diào)節(jié)池的廢水經(jīng)過P1泵提升至斜管沉淀器,在沉淀器內(nèi)通過加藥絮凝作用將廢水中的金屬離子及懸浮物去除。經(jīng)斜管沉淀器作用后,廢水自流進溶氣氣浮機,通過氣浮機的微小溶氣氣泡將污水中大部分懸浮油以及乳化油去除,氣浮過程中為更好的去處浮油以及懸浮物需通過加藥裝置投加PAC、PAM,通過絮凝劑的絮凝作用,將污水中的小顆粒懸浮物絮凝成大顆粒懸浮物,更高速有效的去處水中的浮油以及懸浮物,為后續(xù)的生化部分提供條件。污水經(jīng)氣浮機除油后進入一體化處理裝置。
一體化處理裝置;一體化廢水處理裝置分水解酸化段、接觸氧化段、和二沉池;實現(xiàn)廢水水處理的生化全過程,二沉池設(shè)置污泥回流泵P2,實現(xiàn)A/O工藝的硝化液回流,保證初期的污泥量及生化處理的效果。
沉淀池出水自流進入排水官網(wǎng),至此達標排放。
濟寧天通是一家水處理設(shè)備生產(chǎn)和銷售集一體的公司,公司擁有高尖端的技術(shù)人才,擁有高素質(zhì)的工作團隊,可以及時地為客戶提供完善的售后服務(wù)。我公司主要產(chǎn)品:水處理設(shè)備,污水處理設(shè)備、廢水處理設(shè)備、工業(yè)污水設(shè)備、農(nóng)業(yè)廢水設(shè)備、雨水凈水設(shè)備、醫(yī)院污水設(shè)備、鋼廠廢水設(shè)備、屠宰場廢水設(shè)備、食品廠廢水處理設(shè)備等多種設(shè)備,可根據(jù)要求專業(yè)定制水處理設(shè)備。
The production wastewater from the production workshop is 0.5m3/ h, and it flows through the self-flow pipe in the factory to the oil regulating pool to remove some of the oil from the wastewater and adjust the PH in the regulating pool.
The waste water from the oil regulating pool was raised to the inclined tube precipitator by the P1 pump, and the metal ions and suspension were removed from the waste water by adding drug flocculation in the precipitator. Gravity by the inclined pipe and setting device, the waste water into the dissolved air flotation machine, through tiny dissolved air bubbles of air floatation machine remove most of the floating oil and emulsified oil in sewage, air flotation process to better use oil and suspended solids by dosing PAC and PAM dosing device, through the flocculation flocculant, the sewage of small particles suspended solids flocculated large particles suspended matter condensed, more high speed and effective place to the oil and suspended solids in the water, biochemical section provides conditions for the follow-up. After oil removal, the sewage gas float can enter the integrated treatment device.
Integrated processing unit; The integrated wastewater treatment plant is divided into the hydrolytic acid segment, the contact oxidation section, and the sink pool; To realize the biochemical process of wastewater treatment, the sludge backflow pump P2 was set up in the sink pool to realize the flow of the nitrification solution of A/O process, ensuring the initial sludge volume and the effect of biochemical treatment.
The water flow of the sedimentation tank enters the drainage website.
Jining day pass is a set of water treatment equipment production and sales of the company, the company has sophisticated technology talented person, has a high quality work team, can provide customers with perfect after-sales service in a timely manner. My company main products: water treatment equipment, sewage treatment equipment, wastewater treatment, industrial wastewater, agricultural wastewater, rain water purification equipment, hospital sewage equipment, steel plant waste water equipment, slaughterhouse wastewater treatment equipment, food factory waste water treatment equipment and other equipment, can professional custom according to the water treatment equipment.